Full public program
The kerb as a speculative horizon
Prof. Toma Vale on where pavements end when every direction is technically up.CRATER ROOM
STREAM 4
Bolting nothing to nothing
Fastening lab for fabricators, procurement officials, and one invited geologist.AIRLOCK B
TOOLS ISSUED
Sealed sandwich recess
Lunch and an inspection of the vacuum-rated municipal napkin tether.DARK-SIDE
FOOD COURT
Is a flag already street furniture?
Six panelists, twelve definitions, no anticipated resolution.HALL INFINITY
NO RECORDING
Delegate map / not to scale

A
Crater Room
Keynotes, handrails, hard questions.B
Airlock Lab
Tools, tethers, bolt arguments.C
Shadow Field
Bring 29 km of patience.D
Food Court
Sealed soup, exact change.E
Rover Verge
Parking meters active.?
Hall Infinity
Adjacent after a long walk.
Simultaneous silence channels
CH 01Earth mix
Live interpretation with 1.3-second emotional delay.CH 02Local silence
Vacuum feed with descriptive captions.CH 03Structural audio
Bench vibration translated into polite clicks.CH 04Procurement
All costs read slowly and without oxygen.
Accessibility under one-sixth gravity
On site
- Continuous tether rails between venues.
- Seated rest every 80 lunar metres.
- Captioning on all silence channels.
- Glove-operable controls and maps.
Earthside
- Low-motion panorama stream.
- Text transcript within one Earth day.
- Color-independent permit markings.
- Questions accepted without launch.
Procurement panel rejects cheapest moon
The panel found that the lowest bid omitted the moon itself, six shadow studies, and all post-installation dust.
| Bid element | Required | Lowest bid | Decision |
|---|
| Public bench | 4 seats | 4 seat outlines | Clarify |
| Foundation | Basalt rated | Hope | Reject |
| Shadow plan | 29 km | Not priced | Reject |
| Moon | 1 | By others | Strong reject |